HCRIndustrial InnovationsRequest a Quote

Engineering & Consulting

WPS and PQR Development

Send us the drawings, the specification or an existing procedure package, and we will tell you what qualification the work actually needs. HCR Industrial Innovations develops Welding Procedure Specifications, supports Procedure Qualification Records and reviews existing procedures for manufacturers, fabricators and repair organizations. Much of this is done remotely: we identify the gaps before welding begins and coordinate the supporting documentation. Coupon welding and qualification testing are arranged separately to suit the project.

What a qualified procedure actually requires

A useful welding procedure begins with the product application. Joint design, base materials, service conditions and required properties determine the controls and testing needed. HCR reviews the drawings, customer specifications and applicable construction and qualification standards before proposing a test program. ASME Section IX qualifies procedures and personnel; the construction code and project specifications establish additional requirements for the product.

Under ASME Section IX, essential variables govern changes that require requalification. Nonessential variables must be addressed on the WPS but can be revised without a new procedure qualification. Supplementary essential variables apply when notch toughness is required. Their applicability must be assessed for the specific process and qualification; these ASME categories should not be presented as identical rules under AWS, API or ISO standards.

A qualification coupon must provide the coverage needed for the intended work. Filler metals, joint configuration, process sequence, preheat, interpass controls and any post weld heat treatment are selected together. The PQR records actual qualification conditions and test results. The WPS defines the permitted production instructions supported by that evidence. A complete package connects the production requirements to a defensible qualification record.

How we develop a procedure

  1. Define the application. Review product drawings, material specifications, service conditions and required mechanical or corrosion performance.
  2. Identify the governing requirements. Establish the qualification standard, construction code, applicable editions, customer specifications and witness or approval requirements.
  3. Review existing coverage. Assess whether an existing PQR can support the work before recommending additional qualification testing.
  4. Plan the welding approach. Select processes, joint configuration, consumables, welding position and thermal controls that suit both the engineering requirements and production equipment.
  5. Prepare the preliminary WPS and test plan. Define the coupon, process deposit thicknesses, recording requirements, specimen locations and required examinations.
  6. Perform and document qualification welding. Record actual variables and establish material, consumable and coupon traceability under the responsible qualifying organization's control.
  7. Coordinate testing and evaluate results. Review the laboratory and NDE reports against the applicable acceptance criteria and resolve deviations before release.
  8. Complete the records. Prepare the PQR and supported WPS, document the qualified ranges and obtain the responsible organization's certification or approval as required. The final WPS becomes a controlled production document.

Testing and what it proves

Tensile testing evaluates the strength of a test specimen containing the welded joint. Guided bend testing evaluates ductility and reveals unacceptable discontinuities under the applicable acceptance criteria. Neither test alone proves every aspect of service performance.

Macro examination reveals weld geometry, fusion and penetration at the section examined. Charpy impact testing measures absorbed energy at a specified temperature when notch toughness is required. Hardness surveys assess local hardness in specified regions, such as the weld metal, heat affected zone and base metal, when the code or customer requires them.

The test program depends on the qualification type, governing standard and service requirements. Hardness, macro, impact and NDE examinations are not universal requirements for every ASME Section IX groove weld PQR. HCR identifies the required tests before coupon welding so the records answer the actual qualification question.

Materials and processes we qualify

Procedure development can address GTAW (TIG), GMAW (MIG), FCAW, SMAW and SAW, including combinations selected for root, fill and cap passes. Process selection considers access, productivity, weld quality, consumable availability and the required properties after any heat treatment.

Material coverage is established from the actual specification and supporting records. ASME P-Numbers group base metals for qualification purposes; Group Numbers may also matter when notch toughness is required. F-Numbers group filler metals by usability characteristics and affect qualification requirements. These classifications do not establish alloy equivalence or guarantee matching strength or corrosion performance.

HCR reviews the intended materials and processes project by project. Specific qualification coverage is stated only after the relevant PQRs and production requirements have been checked.

Reviewing a procedure you already have

Send HCR the WPS, supporting PQRs, test reports, drawings and project specifications for a remote welding procedure review. We compare the package with the intended production welds and identify unsupported ranges, missing information, inconsistent variables or testing gaps.

The review covers material and consumable selection, process sequence, qualified thicknesses, applicable position restrictions, thermal controls and required test results. Findings distinguish corrections that can be made to the WPS from conditions that may require additional qualification.

The deliverable is a technical findings summary with recommended actions. Document review can often begin without travel or new testing, although the findings may identify a need for either before the procedure is accepted for production.

From the floor

Common questions

Do I need a new PQR for every project?
Not necessarily. An existing PQR may support a new WPS or application if the qualification covers the required variables and project requirements. Review the records before commissioning another test.
When is Charpy impact testing required?
When the applicable construction code, design or customer specification requires notch toughness. Under ASME Section IX, the applicable supplementary essential variables then require control.
Can procedure development be completed remotely?
Document review, preliminary WPS preparation and qualification planning can often be performed remotely. Coupon welding, witnessing and testing still require an appropriate execution arrangement.
What should I send for a quotation?
Provide drawings, base material specifications, welding processes, applicable codes and editions, customer requirements, existing WPS/PQRs and any heat treatment or special testing requirements.
Can HCR review a rejected package?
Yes. Include the reviewer's comments and all supporting records so HCR can identify the technical gaps and recommend a correction or qualification plan.

Send your WPS/PQR package or project drawings for a welding procedure review.

Start a request

Send us your next drawing package.

A drawing, a material specification and a quantity are enough to start. Tell us the tolerance that matters most and the date you need it, and we will tell you what we can hold and when. If the part is outside our envelope, you will hear it on the first call rather than on the delivery date.

11330 Charles Road, Houston, Texas 77041  ·  346-439-5011