The procedure comes first
The welding procedure is written to the governing code, qualified by test, and the welders are qualified to it before production starts. Nothing reaches the arc on assumption.
Capability
Pressure and non-pressure fabrication, structural work, cladding, hard-facing and weld repair — with the welding engineering that governs them in the same building.

Multi-pass groove weld
Root through cap, run to the qualified procedure
The welding procedure is written to the governing code, qualified by test, and the welders are qualified to it before production starts. Nothing reaches the arc on assumption.
Weld repair, build-up, cladding and hard-facing on components that are worth restoring rather than replacing — including work other shops quote around.
From the floor








A drawing, a material specification and a quantity are enough to start. Tell us the tolerance that matters most and the date you need it, and we will tell you what we can hold and when. If the part is outside our envelope, you will hear it on the first call rather than on the delivery date.